Gold processing checks, from material identification to batch closure.

0/19 checked ·

Aurik Prime logoAURIKPRIME

CHECKLIST 07

VAT Leaching Operations & Monitoring

Sign off process conditions, reagent movements, events and deviations; retain repeated readings in the detailed log.

Operating limits and chemical procedures must come from approved site instructions and qualified technical personnel.

Detailed VAT log

1. Shift & pre-start

YesNoInput
Correct VAT and batch confirmed
Approved operating procedure available
Required equipment and instruments checked
Starting readings recorded

2. Process monitoring

YesNoInput
Required readings recorded at scheduled intervals
Solution measurements recorded with units
Reagent additions and quantities documented
Equipment and circulation status checked
Sampling events and results referenced
Process observations and trends recorded

3. Exceptions & safety

YesNoInput
Abnormal readings identified and escalated
Downtime, alarms and incidents recorded
Authorized interventions documented
Safety and environmental concerns addressed
Required corrective actions tracked

4. Shift handover

YesNoInput
Current process stage and status recorded
Outstanding tests and actions listed
Reagent and equipment issues communicated