Gold profit report
Date: —
Price per gram (TZS/g): 314,826.54 · Mining Commission buying centre (TZS/g)
Source: Mining Commission · Price date: 19 Oct 2026
Inputs
| Trucks | 0.22 |
|---|---|
| Volume (m³) | 4.40 |
| Bulk density (t/m³) | 1.00 |
| Tonnes (t) | 4.40 |
| Grade (g/t) | 1.000 |
| Recovery (%) | 70.00 |
| Elution recovery (%) | 100.00 |
| Tax (%) | 8.00 |
| Actual material cost (TZS) | 0 |
| Transport (TZS) | 0 |
| Loading cost (TZS) | 5,000 |
| Chemicals (TZS) | 0 |
| Labour (TZS) | 2,000,000 |
| Plant rent (TZS) | 1,000,000 |
| Elution rent (TZS) | 0 |
Breakdown
| Contained gold | 4.40 g |
|---|---|
| Recovered gold | 3.08 g |
| Gross | 969,666 TZS |
| Tax | 77,573 TZS |
| Revenue | 892,092 TZS |
| Material cost (estimated) | 323,222 TZS |
| Transport | 0 TZS |
| Loading cost | 5,000 TZS |
| Chemicals | 0 TZS |
| Labour | 2,000,000 TZS |
| Plant rent | 1,000,000 TZS |
| Elution rent | 0 TZS |
| Total costs | 3,328,222 TZS |
| Profit | -2,436,129 TZS |
Estimate only. Actual results depend on assay, recovery and costs on site. This is not an offer by Aurik Prime to buy or sell.