Sampling points

Example data

Process overview

Test 2
VatSolutionMaterialCarbon columnsPregnant solutionBarren solutionReturn to vat →VatSolutionMaterialCarbon columnsPregnant solutionBarren solutionReturn to vat →

Vat residue

1.000 g/t▼ falling

Gauge maximum: 4.0 g/t

Pregnant solution

5.000 mg/L▲ rising

Gauge maximum: 5.0 mg/L

Barren solution

0.100 mg/L● flat

Gauge maximum: 5.0 mg/L

Shared solution scale: 5.0 mg/L

1Test 1

Solid material in the vat.

Solution leaving the vat into the carbon. mg/L = ppm.

Solution after the carbon. mg/L = ppm.

2Test 2

Solid material in the vat.

Solution leaving the vat into the carbon. mg/L = ppm.

Solution after the carbon. mg/L = ppm.

Operating context

Inference 01 · Example data

Leaching strongly

Residue is falling quickly while gold in the pregnant solution is rising or steady.

Next step

Continue. Retest in 2–3 days.

Why

Days between tests
4
Vat residue
2.000 → 1.000 g/t · falling · -50.00%
Pregnant solution
4.000 → 5.000 mg/L · rising · 25.00%
Barren solution
0.100 → 0.100 mg/L · flat · 0.00%
Residue extraction per day
12.50%
Pregnant–barren gap
4.900 mg/L · 98.00% · far
Recovery so far
75.00% · Grade: 4.000 g/t
Free cyanide, pH and aeration checked and normal
Not confirmed
Tolerance (%)
10.00%
Strong extraction (% per day)
5.00%
Close gap (%)
20.00%
Target recovery (%)
70.00%

Test trends

▼ falling
Vat residue
2.01.00.0Test 1Test 220 Nov 202624 Nov 2026
Vat residue · g/t
▲ rising
Pregnant solution
5.02.50.0Test 1Test 220 Nov 202624 Nov 2026
Pregnant solution · mg/L
● flat
Barren solution
1.00.50.0Test 1Test 220 Nov 202624 Nov 2026
Barren solution · mg/L
Solution comparison
5.02.50.0Test 1Test 220 Nov 202624 Nov 2026
Pregnant solution · mg/LBarren solution · mg/L
Aurik Prime
AURIK / PRIME

Leach progress report

Example data

Test 1: 20 Nov 2026 · Test 2: 24 Nov 2026

Leaching strongly

Residue is falling quickly while gold in the pregnant solution is rising or steady.

Continue. Retest in 2–3 days.

Why

Days between tests4
Vat residue2.000 → 1.000 g/t · falling · -50.00%
Pregnant solution4.000 → 5.000 mg/L · rising · 25.00%
Barren solution0.100 → 0.100 mg/L · flat · 0.00%
Residue extraction per day12.50%
Pregnant–barren gap4.900 mg/L · 98.00% · far
Recovery so far75.00% · Grade: 4.000 g/t
Free cyanide, pH and aeration checked and normalNot confirmed
Tolerance (%)10.00%
Strong extraction (% per day)5.00%
Close gap (%)20.00%
Target recovery (%)70.00%

A guide, not a guarantee. Confirm completion with a residue assay at an accredited laboratory.

aurikprime.com · Aurik Prime Limited

Other tools

Gold Profit Estimator

Estimate gold recovery, operating costs and profit.